Henan Yuhui 600000t a slag powder 900000t a cement 1000000t a auxiliary materia in December 2014
Main equipment configuration: GRMS46.41 slag vertical mill
Production time: December 2014
Project introduction: this project was designed to be equipped with one mill with three purposes, and seven sets of microcomputer belt weighers are designed before Xinxiang Great Wall’s high-efficiency vertical roller mill, and two blender mixers and active admixture device are designed at the end of the mill. And the switch within three raw materials (slag, cement and auxiliary material) only need 40 minutes! This production line runs stably with low energy consumption and high output, and can produce 120t/h Level S95 slag powder, 150t/h cement and 150t/h auxiliary material powder with small dust emission. The client likes this line very much and thanks Great Wall by sending a silk banner to it.