Industry Reports

Some operations during the operation of chaeng vertical roller mill

  • By
  • Mar 20, 2019  UTC+8
  • Views:
  • Tags: vertical roller mill vertical grinding mill

During the operation of the vertical mill, a group of talents who can stick to their posts and have strong subjective initiative are required to carry out their duties. It is able to strictly implement the post responsibility system, ensure safe production, avoid and eliminate accidents, fully excavate the equipment there, and quickly and economically complete the technical indicators of the vertical mill production products to truly achieve high yield, high quality and low consumption.

vertical roller mill

Therefore, in the operation, the relevant operators must be careful and meticulous, they have a serious scientific attitude, learn to adapt to the objective conditions of the flowers in different situations, deal with the problems in time, and master the initiative of production.

Vertical grinding mills often encounter bearing damage during use. Since updating the bearings is a very troublesome thing, the user wants to minimize the damage of the bearings. Before the new material or manufacturing process of the bearing is produced, we can only start from some small aspects of the machine itself, and the details determine success or failure. Therefore, it is recommended to operate the staff of the vertical mill, starting from the details and let the bearings last longer.
\

Vertical mill fineness adjustment. According to the size of the material, soft and hard, water content, specific gravity, the thickness of the processing is also different, the upper analyzer can be adjusted, the rotation speed is high, the fineness is high, the rotation speed is low, and the fineness is low. Users have the flexibility to master. The scraping limit of the grinding roller ring, the remaining minimum wall thickness shall not be less than 10mm. When parking, stop feeding, the main machine continues, so that the residual abrasive continues to be milled. After about one minute, the main motor and analyzer can be turned off, the grinding operation is stopped, and then the fan motor is stopped to blow.


info@chaeng.co +8615638871509