Industry Reports
slag production line/slag grinding plant with latest technology
Chaeng slag production line with latest technology with the following aspects:
1, separate wet and dry
That slag mill and feed back and separate wet slag into the mill. Wet slag by spiral reamer feed mill stand, in addition to iron feed back by the rotary feeder vertical mill feed chute through.
Since the slag has its own hydraulic weak, dry and wet slag vertical mill mixed material back hydration reaction will occur weakly caking children, so the conventional mixing feed screw reamer program will cause compaction, resulting in transmission capacity reamer decline even reamer shaft fracture.
2, the outer loop using pipes buried scraper hoist combination Separators
Using pipes buried scraper hoist vertical mill separator combination delivery efflux, since the feed back is always in the housing, it is possible to prevent dust spills back to the material, can greatly improve the vertical mill surrounding environment; traditional except conveyor belt hanging iron hoist combination, the conveyor belt sticky material, resulting in the suspension of operation of separator air flow will cause a large amount of dust that location, the surrounding environment is poor.
3, slag former into the slag mill provided steady flow positions
Setting steady flow of slag from the roller mill and warehouse closer to, under steady flow of slag through the belt scale measurement positions after a short drop to the belt, belt conveyor into the slag spiral reamer into the mill.
Setting stable chamber allows more uniform feed roller mill, vertical mill run more stable.
4, stop grinding material by efflux warehouse reentry vertical mill
Vertical mill stop grinding, the outer discharge tube through a slide back into the outer row of storage memory on the frame material, the outer row positions under measurement, said after the start grinding again, again fed by a metering called metering roller mill grinding.
5, set the dust collector on the delivery chute corridors
Dust collector disposed in the chute between the elevator corridor finished powder collecting device to make the chute and finished hoist always running under negative pressure, to avoid housing seal looser caused dust to escape.
6, gate valve replacement using two high failure rate of the three-way dosing valve
7, other innovative technology