Industry Reports

Chaeng(great wall )vertical roller mill for waste slag grinding as a key equipment

  • By
  • Nov 08, 2017  UTC+8
  • Views:
  • Tags: slag grinding line slag vertical mill

In recent years, with the continuous development of industrial production. From ball mill to the development of vertical roller mill , Grinding machine has also undergone a historic reform.
\

The traditional ball mill system is more cumbersome compared with the new vertical roller mill. The whole system construction body consists of multi-layer frame building, vertical roller mill is distributed among the layers of the equipment, vertical roller mill connecting the pipeline through the layers of the frame. At the same time dust, covers an area of up to noise. Not suitable for moisture content of raw materials, but quality is difficult to control

Replacement of the vertical roller mill grinding in the process system has made a huge change. Set up grinding, transportation, powder, drying in one of the vertical mill equipment greatly saves the area, closed production space system also reduces the noise, while reducing the dust pollution. For a variety of materials have different parameters set, the material is more easy to adjust.

System operating rate, ball mill system shutdown rate is high, online stacking consumes a long time, the system operation rate is low. Vertical mill is very low downtime, on-line welding time, the system operating rate is high.

vertical mill for waste slag grinding has following advantage

1. Reduce investment costs, intelligent control

2. Adjust fineness according to demands

3. Power consumption per set of GRMS is not more than 30Kwh

4. Remarkable energy-saving and environmental protection, convenient maintenance

5. Original spare parts to reduce maintenance worry


info@chaeng.co +8615638871509