Industry Reports

Choose waste slag grinding equipment,Choose Chaeng

  • By
  • Nov 07, 2016  UTC+8
  • Views:
  • Tags: waste slag grinding equipment Chaeng

Vertical mill and ball mill are slag, steel slag, nickel slag and other waste slag preparation of key equipment, its quality directly determines whether the normal operation of the production line.Therefore, the choice of waste slag grinding equipment suppliers, we must look at whether it has spare parts supply and production capacity, so as not to follow-up replacement parts, maintenance of spare parts to bring all kinds of trouble, delay the normal production.

1.Waste slag grinding equipment quality guaranteed

Modern factories, sophisticated equipment, advanced technology is to create quality products that guarantee. Chaeng(Xinxiang Great Wall) has a large steel casting base, mechanical processing equipment, well-equipped, with China's machinery industry's largest and most advanced 6m × 6m × 16.5 m cylinder overall electric heating automatic control annealing furnace. Grinding table, grinding roller, vertical mill rocker, and other vertical mill main components, large gears, hollow shafts and other ball mill main spare parts from casting to finished products, as well as the entire production line system needs auxiliary equipment, such as dust collector, petrol stations, control cabinet, non-standard pipeline, The quality of processing equipment package.

5d3d69f803198dc8b7ffc01936cc454e.jpg

2.Shorten the supply of waste slag grinding equipment

Large-scale cast steel casting processing base to ensure that the product manufacturing cycle, Xinxiang Great Wall has a professional, batch production advantages, in ensuring the quality of products under the premise of shortening the supply of waste grinding equipment. Such as the Xinxiang Great Wall will mill to ensure delivery within 4-6 months, at the same time, you can ensure that the entire production line construction cycle shortened to 6-8 months.

It is reported that the project is in November 2015 signed a contract with the Great Wall Machinery, 2016 began manufacturing, civil installation began in June, at present, this annual output of 300,000 tons of nickel slag grinding production line successfully installed!

矿渣2.jpg

3.Waste slag grinding equipment, post-maintenance convenience

According to market research, some customers in the production of waste slag often encounter post-maintenance responsibility prevarication, no door-to-door service, no replacement parts and other problems, to produce a serious impact. Xinxiang Great Wall to large-scale casting base as the basis, providing equipment, auxiliary processing and grinding equipment, complete sets of accessories, completely solve this problem, the original host, the original spare parts, so that customers more at ease, peace of mind.

High-performance waste slag grinding equipment, is the basic guarantee of producing quality products. Therefore, the customer should be a comprehensive inspection, many considerations, only the choice of reliable equipment manufacturers waste slag in order to protect the normal operation of the latter part of the production equipment.

 


info@chaeng.co +8615638871509